You don't have javascript enabled. Good luck with that.
Pencarian
Progres Pembangunan Flyover Latumenten Capai 41,28 Persen

Latumenten Flyover Construction Progress Reaches 41.28 Percent

The Jakarta Public Works Agency (Bina Marga) recorded that the construction progress of the Latumenten Flyover had reached 41.28 percent as of mid-May 2026. Currently, the project has entered the girder erection stage, or the process of lifting and installing precast concrete girders as the main structure of the flyover.

improve connectivity and facilitate community mobility

Head of Data and Information Center of the Agency, Siti Dinarwenny, said the construction of this flyover is carried out to improve traffic flow and reduce vehicle congestion in the West Jakarta area.

Latumenten Flyover Expected to Significantly Reduce Traffic Congestion

"Work is currently in the lifting and installation phase of the precast concrete girders into their planned positions on the flyover structure using heavy equipment. This stage is a crucial part of creating the flyover's main structure, which will support traffic loads," she said.

She added that the girder erection work will be carried out in stages at night to minimize traffic disruption and maintain the safety of road users during the construction process.

She explained that girder erection work on the west side of Jalan Prof. Dr. Latumenten will be carried out from May 18–26, 2026, at 10 PM–4 AM. Meanwhile, work on the east side of Jalan Dr. Makaliwe Raya is scheduled to take place from May 29 to June 5, 2026, at the same times.

As for information, the Latumenten Flyover is built with a west side length of 435 meters and an east side length of 426 meters with a flyover width of 11 meters.

"This infrastructure is expected to improve connectivity and facilitate community mobility in the Latumenten area and its surroundings," she explained.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye757 personAldi Geri Lumban Tobing
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye587 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye549 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye538 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye520 personAldi Geri Lumban Tobing